They did it once by mixing meters and feets, and crashed the Mars lander.
Edit: looked it up, wasn’t actually meters vs feet, but newton-seconds vs some American eagles per gun unit for force
It’s guns per eagle, get it right. What would eagles per gun even be?
Step clap step step clap
A gun that shoots eagles, obviously
We don’t shoot eagles in America, we shoot turkeys. Just as Benjamin Franklin intended.
Pound-seconds, I believe. Good ol’ LM giving imperial numbers to NASA.
it’s an orbiter not a lander
It was intended to be an orbiter.
Hopefully, the transition to metric is soon and I can stop reading this same joke every week.
Technically the US measurement system is metric since the Mendenhall Order of 1893 reestablished all customary units as conversion factors of metric units. In 1933 the ASA redefined the inch to be exactly 25.4mm, following the lead of the British Standards Institution in 1930 (precision was increasingly important for manufacturing, and the previous value of 25.40005mm had become impractical). The international yard and pound were officially adopted by the US National Bereau of Standards (now NIST) in 1959, the Metric Conversion Act was passed in 1975, and finally EO 12770 (1991) required all agencies of the executive branch to transition to metric units.
So, from one point of view we’ve been transitioning to metric since 1893 and it’s still not done. From another, the inch is just a metric unit as its length is officially defined in millimeters (all customary units are now based on SI units), therefore the conversion is complete.
it happened again with the Intuitive Machines lander that landed on the moon last week
The Intuitive Machines lander issue was that no one disarmed the safety switch on the laser guidance system. (No, really!) Luckily NASA had a backup system installed that ended up working better anyway.
Pretty much the hardware version of && false
that ended up working better anyway
Not sure if it ended up working better, as it landed with nonzero horizontal velocity. Though I suppose we’ll never know how well the original system would have performed…
If a TODO passes code review, more than one person fucked up.
At my first job after university, we did releases every Friday evening. From 3-5pm, all you would see in the Slack channel was a flurry of everyone committing straight to master (with a bunch of merge conflict commits between). Oh and then we’d release. Fun times.
A free for all, late Friday deployment is baffling… We’ve got a strict window of Tuesday-Thursday for releases (unless it’s a critical issue), and a 2-3 day merge freeze to help mitigate unexpected changes.
We’ve got a relatively small team with LOTS of moving parts, so minimizing deployment issues is always top of mind.