Blaze (he/him)@sopuli.xyz to Casual Conversation @lemm.eeEnglish · 3 days agoI recently changed a lightbulb that I was forgetting about for weeks (part of a 3-set). I took me a few minutes once I committed to it. What's the last menial task you postponed for far too long?message-squaremessage-square32linkfedilinkarrow-up153arrow-down11
arrow-up152arrow-down1message-squareI recently changed a lightbulb that I was forgetting about for weeks (part of a 3-set). I took me a few minutes once I committed to it. What's the last menial task you postponed for far too long?Blaze (he/him)@sopuli.xyz to Casual Conversation @lemm.eeEnglish · 3 days agomessage-square32linkfedilink
minus-squareCompactFlax@discuss.tchncs.delinkfedilinkEnglisharrow-up3·3 days agoI’ve had holes in my wall from some electrical diy work since 2019. It’s getting fixed this week. Fuck, I hate plastering. Actually, I hate detailed finish work. I’m cut out to be a plumber or electrician, none of this fancy shit.
minus-squareDonnywholovedbowling@lemmy.worldlinkfedilinkEnglisharrow-up2·2 days agoI feel this hard. Replaced a shower in 2019 and keep having leaks and opening the kitchen ceiling to fix them…I think it’s good now l, but holy damn I’m tired of doing bad drywall work
I’ve had holes in my wall from some electrical diy work since 2019.
It’s getting fixed this week.
Fuck, I hate plastering. Actually, I hate detailed finish work. I’m cut out to be a plumber or electrician, none of this fancy shit.
I feel this hard. Replaced a shower in 2019 and keep having leaks and opening the kitchen ceiling to fix them…I think it’s good now l, but holy damn I’m tired of doing bad drywall work