June 13th, 2022. 7:13pm. If that’s the last one I burn, I will at least know when. It was Windows XP Media Center 2005, for my fleamarket Dell Demension E510. Well, more accurately, an E310 with a E510 motherboard.
I’m about to drop a supermicro Xeon board plus an E3-1275 and 32G of ECC ram into the guts of this old Optiplex 790 mini tower I have. (i3 2100, so a generation newer, and a Xeon instead of an i3)
I plan to eventually get a better case but for now this is fine. Right now it’s running Plex media server on FreeBSD on bare metal, but I’m planning to swap to proxmox once I get the new board installed.
Unfortunately that won’t be for another week. While the board will be here today, it is a little more power hungry than the old system, and I’m already pushing the OEM 375W PSU with 5 drives (SATA SSD and 4 7200rpm SAS drives) so I also have a PSU coming. But that is not expected until middle of next week.
June 13th, 2022. 7:13pm. If that’s the last one I burn, I will at least know when. It was Windows XP Media Center 2005, for my fleamarket Dell Demension E510. Well, more accurately, an E310 with a E510 motherboard.
I’m about to drop a supermicro Xeon board plus an E3-1275 and 32G of ECC ram into the guts of this old Optiplex 790 mini tower I have. (i3 2100, so a generation newer, and a Xeon instead of an i3)
I plan to eventually get a better case but for now this is fine. Right now it’s running Plex media server on FreeBSD on bare metal, but I’m planning to swap to proxmox once I get the new board installed.
Unfortunately that won’t be for another week. While the board will be here today, it is a little more power hungry than the old system, and I’m already pushing the OEM 375W PSU with 5 drives (SATA SSD and 4 7200rpm SAS drives) so I also have a PSU coming. But that is not expected until middle of next week.